Skip to main content
居家與建築計算器

drywall計算器

依牆面與天花板計算石膏板用量,含損耗、螺絲、接縫帶、嵌縫膏及可選板材費用。支援常見板材尺寸及英制/公制。

Read the complete step-by-step guide
Live calculator

Estimate drywall sheets and finishing supplies from room dimensions or a known area. Switching units converts your current project.

Project area

ft
ft
ft
×

Openings

sq ft

Enter 0 if there are no openings to subtract.

Panels & waste

%
$

Finishing supplies

ft
gal

Drywall material estimate

Sheets needed19
Net area528 sq ft
WallArea384 sq ft
CeilingArea144 sq ft
Openings0 sq ft
Approx. screws564 pcs

Planning factors: walls 1.0 and ceilings 1.25 screws per sq ft. Known-area mode uses the wall factor.

Tape length195.36 ft

USG-style planning guidance: approximately 0.37 linear ft per sq ft.

Tape rolls1
Conventional all-purpose ready-mix5.28 gal
Compound pails2

Sheet count is an area-based planning estimate. Actual panel layout can change waste and sheet requirements.

Joint compound needs vary with finish level, application, and product; confirm coverage on the product label.

Formula

石膏板計算器依房間尺寸或已知面積、開口、板材尺寸與耗損估算張數及表面處理材料。 房間牆面面積 Wall Area = 2 × (Length + Width) × Height 天花板(可選) Ceiling Area = Length × Width 淨石膏板面積 Gross Area = Wall Area + Ceiling Area Net Area = Gross Area − Openings 若 openings > gross area,計算器回傳驗證錯誤(不會歸零)。 已知面積模式:Gross Area = 輸入的 sq ft 或 m²(忽略房間尺寸與天花板開關)。 Quantity 乘以相同房間/區段。 板材面積 Panel Area = Panel Width × Panel Length 預設:4×8 = 32 sq ft,4×9 = 36,4×10 = 40,4×12 = 48(或自訂)。 耗損與張數 Adjusted Area = Net Area × (1 + Waste% ÷ 100) Sheets = ceil(Adjusted Area ÷ Panel Area) 中間面積保留完整精度,只將可購買張數無條件進位。 板材費用(可選) Estimated drywall sheet cost = Sheets × Price per Sheet (不含螺絲、接縫帶、批土、人工、稅金或運送。) 表面處理材料估算(按淨面積—不套用板材耗損) 牆面螺絲 ≈ net wall area × 1.0 / sq ft 天花板螺絲 ≈ net ceiling area × 1.25 / sq ft Tape ≈ net area × 0.37 linear ft / sq ft(≈ USG 規劃參考 370 ft / 1,000 sq ft) 可選接縫帶捲數 = ceil(tape ÷ roll length) 批土(選擇一種;規劃用量) 一般全用途預拌型 ≈ 0.010 gal / sq ft (10 gal / 1,000 sq ft) 輕質預拌型 ≈ 0.009 gal / sq ft 輕質凝結型 ≈ 0.052 lb / sq ft 一般凝結型 ≈ 0.072 lb / sq ft 可選容器數 = ceil(required ÷ pail or bag size) 限制 張數是基於面積的規劃估算。實際排板、邊料再利用、牆體形狀、開口、板材方向與骨架會改變需求;批土也隨表面處理等級(如 Level 4 與 Level 5)變化。

How to Calculate

如何計算 1. 選擇房間尺寸或已知石膏板面積。 2. 房間模式輸入長、寬、高(US Customary ft / Metric m)。 3. 選擇是否包含天花板。 4. 輸入門窗或開口總面積。 5. 選擇 4×8 / 4×9 / 4×10 / 4×12 或自訂板材。 6. 輸入耗損率(10% 是常見規劃起點)。 7. 選擇批土種類;可設定接縫帶捲長與容器規格。 8. 可輸入每張價格與相同房間數量。 9. 查看張數、牆/頂/淨面積、螺絲、接縫帶、批土與費用。 10. 購買前核對產品覆蓋率、厚度與固定要求。 耗損指南 耗損涵蓋裁切、破損、邊料、轉角與排版差異。簡單矩形專案約 10%,複雜配置可能更多。 板材尺寸說明 大板能減少接縫但較難搬運。天花板施工與本地庫存也影響選擇;Metric 市場可用自訂 millimetre 尺寸。 板面覆蓋參考 尺寸 | 每張面積 | 1,000 sq ft 加 10% 耗損約需張數 4×8 ft | 32 sq ft | 35 4×9 ft | 36 sq ft | 31 4×10 ft | 40 sq ft | 28 4×12 ft | 48 sq ft | 23 每 1,000 sq ft 淨面積表面處理材料 接縫帶 | ~370 linear ft 一般全用途預拌型 | ~10 gal 輕質預拌型 | ~9 gal 輕質凝結型 | ~52 lb 一般凝結型 | ~72 lb 實際用量隨產品、表面處理等級、施工方法與現場條件變化。 螺絲估算說明 螺絲數受骨架間距、牆/頂、板材方向、構造要求、固定間距及木/輕鋼骨架影響;勿將單一顆數/sq ft 當成通用規範。

Examples

範例 1 — 12×12 房間,8-ft 天花板,4×8 板 Walls: 2 × (12 + 12) × 8 = 384 sq ft Ceiling: 12 × 12 = 144 sq ft Total: 528 sq ft 10% waste: 580.8 sq ft 4×8 panel: 32 sq ft Sheets: 580.8 ÷ 32 = 18.15 → 無條件進位為19張 範例 2 — 10×10 房間,9-ft 天花板 Walls: 2 × (10 + 10) × 9 = 360 sq ft Ceiling: 100 sq ft Total: 460 sq ft 4×8 耗損前: 460 ÷ 32 = 14.375 → 15張 加 10% 耗損: 506 ÷ 32 = 15.8125 → 16張 範例 3 — 已知面積 1,000 sq ft,耗損 10% Adjusted: 1,100 sq ft 4×8: 1,100 ÷ 32 = 34.375 → 35張 4×10: 1,100 ÷ 40 = 27.5 → 28張 4×12: 1,100 ÷ 48 = 22.9167 → 23張

關於此計算器

石膏板計算器依房間尺寸或已知面積估算板材與表面處理材料。支援 US Customary/Metric、可選天花板、開口、預設/自訂板材、耗損、相同房間數量、概算螺絲、接縫帶、所選批土及可選板材費用。這是面積式規劃工具,並非逐牆排板最佳化工具。

房間尺寸或已知面積

按長、寬、高及可選天花板計算,或直接輸入已知石膏板面積。開口可輸入總面積,或門窗尺寸與數量。

板材、耗損與表面處理

選擇 4×8 / 4×9 / 4×10 / 4×12 或自訂板。耗損只調整張數;同時查看螺絲、接縫帶、一種批土及可選捲數/容器數。

透明的規劃假設

螺絲按牆面 ~1 / sq ft、天花板 ~1.25 / sq ft;接縫帶按 ~0.37 ft / sq ft。批土採用公開規劃用量,現場用量仍隨表面處理等級與排板變化。

Best for
  • 臥室
  • 地下室
  • 車庫
  • 天花板
  • 住宅增建
  • 整房估算
  • 承包商數量計算
  • DIY 石膏板工程

常見問題

Quick answers about this calculator—how it works, accuracy, and everyday use.

選擇 US Customary 或 Metric,輸入房間長、寬、高(可選天花板),或切換至 Known drywall area。扣除開口、選擇板材尺寸並設定耗損率,即可查看無條件進位的張數。螺絲、接縫帶與批土按淨面積計算,不含板材耗損。

牆面面積 = 2 × (長度 + 寬度) × 高度。若天花板也鋪板,再加天花板面積 = 長度 × 寬度,並扣除不鋪板的開口。Metric 模式下尺寸用 metres,面積用 m²。

一張 4×8 覆蓋 32 sq ft,耗損前 500 ÷ 32 = 15.625 → 16張。加 10% 耗損後,550 ÷ 32 = 17.1875 → 規劃18張。

耗損前 1,000 ÷ 32 = 31.25張。加 10% 耗損後,1,100 ÷ 32 = 34.375 → 規劃35張。

高度 8 ft、只算牆面:2 × (10 + 10) × 8 = 320 sq ft → 耗損前需10張 4×8。含天花板為 420 sq ft → 14張;再加 10% 耗損:462 ÷ 32 = 14.4375 → 15張。

高度 8 ft 且含天花板:牆面 384 + 天花板 144 = 528 sq ft。加 10% 耗損並使用 4×8 板:580.8 ÷ 32 = 18.15 → 19張。

8 ft 高牆面為 2 × (20 + 20) × 8 = 640 sq ft,天花板 400 sq ft,共 1,040 sq ft。加 10% 耗損為 1,144 sq ft → 約36張 4×8(1,144 ÷ 32 = 35.75 → 36)。

要在頭頂鋪板時應包含;只做牆面時關閉。切換 Include ceiling 會立即改變淨面積、張數、螺絲、接縫帶與批土結果。

可扣除不鋪板的大型開口。輸入開口總面積,或門窗尺寸及數量。若開口超過可鋪板表面,計算器會回傳驗證錯誤,而非默認為零。

簡單矩形房間常用約 10% 作為規劃起點,用於裁切、破損、難利用邊料、轉角與排版差異。複雜形狀或開口較多時可能需要更高比例。

一張 4×8 的板面面積為 32 sq ft,是北美住宅最常見的規格。

一張 4×12 覆蓋 48 sq ft。大板可減少接縫,但更重、更難搬運,應配合庫存與天花板高度選擇。

4×12 每張面積較大,可減少長牆或天花板接縫,但搬運安裝較難。4×8 較普遍且適合 DIY。請依房間尺寸、施工人力與本地庫存選擇。

本計算器按牆面約 1顆/sq ft、天花板約 1.25顆/sq ft 估算。實際數量取決於骨架間距、板材方向、牆/頂、木/輕鋼骨架及規範。只按牆面係數,1,000 sq ft 約需1,000顆。

常用規劃參考約為 370 linear ft/1,000 sq ft(0.37 ft/sq ft)。實際接縫長度取決於板材尺寸、方向與房間幾何形狀。

取決於產品與表面處理等級。規劃用量:一般全用途預拌型 ≈ 10 gal / 1,000 sq ft;輕質預拌型 ≈ 9 gal;輕質凝結型 ≈ 52 lb;一般凝結型 ≈ 72 lb。Level 5 / 全面薄批通常更多,請查產品標示。

以所需長度除以每捲長度並無條件進位。例如約 195 ft 接縫帶,用 250 ft 捲為1捲;用 75 ft 捲則 ceil(195 ÷ 75) = 3捲。

選擇種類,估算 gallons 或 pounds,再除以桶或袋規格並無條件進位。例如約 5.3 gal 預拌批土使用 4.5 gal 桶:ceil(5.3 ÷ 4.5) = 2桶。

相同房間使用 Quantity;不同房間分別計算後加總。對於不規則空間,將淨面積加總後使用 Known drywall area。

測量各牆面及要完成的天花板,扣除大型開口後輸入 Known area;簡單矩形空間也可用房間尺寸。地下室常有更多轉角與包樑,可考慮提高耗損率。

切換至 Metric:房間尺寸用 metres,已知面積用 m²,自訂板材用 millimetres。切換單位時,工具會換算同一個實體專案。

輸入可選的每張價格,即可看到預估板材成本 = 張數 × 每張價格。該數值不含螺絲、接縫帶、批土、人工、稅金或運送。

會。橫鋪與直鋪會改變接縫長度及批土需求。本計算器按面積估算張數,不最佳化鋪板方向;表面接縫應另行規劃。

它以完整內部精度套用面積公式,並將可購買張數無條件進位。實際工程受排版、邊料再利用、開口、骨架及表面處理等級影響;購買前請核對板材規格與產品覆蓋率。

日常用語中大致相同。Sheetrock 是 gypsum board(石膏板)的品牌名稱。板材另有 4×9、4×10、4×12 及多種厚度;非標準板面可使用 Custom panel size。